Hospitality
![](https://www.titanconsultants.com/wp-content/uploads/2024/06/asset-generation-463f88a5-93a2-47d6-b123-1a98656137a3-3-small.jpg)
TENNIS COURTS- KILLEEN,TX
TENNIS COURTS- KILLEEN, TX BRIEF DESCRIPTION Project Overview: Client: Tennis Courts – Killeen, TXIndustry: Hospitality Contractor Details: Contractor: Hellas Contract
![](https://www.titanconsultants.com/wp-content/uploads/2024/06/asset-generation-e2fd7559-993c-4931-ae2c-c98ac479b002-3-small.jpg)
NATHIC SOLDIER SYSTEM CENTER(NSSC)- NATHIC, MA
NATICK SOLDIER SYSTEM CENTER(NSSC), MA W912DY-15-D-0043 BRIEF DESCRIPTION Client: Natick Soldier Systems Center (NSSC) – Natick, MA Industry: Hospitality Contractor
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/johnday1-51-1.jpg)
ARC RENOVATION – HUNTSVILLE, AL
ARC RENOVATION- HUNTSVILLE, AL W912-HP-21D6001 BRIEF DESCRIPTION Client: ARC Renovation – Huntsville, AL Industry: Hospitality Contractor Details: Contractor: SES Electrical
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Key-West-Hotel1-1536x1152-1-1.jpg)
NAVY GATEWAY INN – KEY WEST, FL
NAVY GATEWAY INN KEY WEST, FL N69450-19-C0903 Previous slide Next slide BRIEF DESCRIPTION Lodging Facility Overview The new lodging facility
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/20190807_070512-scaled-550x412-proj-11-1.jpg)
PHARMACY RENOVATION – TRAVIS AFB, CA
PHARMACY RENOVATION TRAVIS AFB, CA W9127S-13-D-6005 BRIEF DESCRIPTION Electrical System Upgrades and Installations Overview TITAN Consultants is involved in a
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Dyess-AFB-proj-6-1.jpg)
DBIO CLINIC RENOVATION – DYESS AFB, TX
DBIO CLINIC RENOVATION DYESS AFB, TX W9127S-13-D-6005 TO# 0003 BRIEF DESCRIPTION Scope of Work Overview TITAN Consultants specializes in designing,
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/kingsbay-w1-37-1.jpg)
BRANCH HEALTH CLINIC MODERNIZATION, BLDG 1028, NAVAL STATION KINGS BAY, GA
BRANCH HEALTH CLINIC KINGS BAY, GA N6247015C5009 BRIEF DESCRIPTION Project Overview The project entails the construction of a facility spanning
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/vachiller1-53-1-1.jpg)
REPLACE CENTRAL CHILLER PLANT – FARGO, ND
REPLACE CENTRAL CHILLER PLANT FARGO, ND VA26316C0093 BRIEF DESCRIPTION Project Overview The project entails the installation of a new modular
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/VAMC-W-2-47-1.jpg)
MRI/LAB GENERATOR INSTALL – LEBANON, PA
MRI/LAB GENERATOR INSTALL LEBANON, PA VA24416C0378 BRIEF DESCRIPTION Project Overview The project involves installing a new generator system designed to
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/640px-William_Beaumont_Army_Medical_Center_from_High_Vista_Apartments-proj-3-1-1.jpg)
REPLACE OR CHILLERS, EL PASO, TX
CHILLER REPLACEMENT EL PASO, TX VA25717J2426 BRIEF DESCRIPTION This project involved a critical upgrade to the existing central chilled water
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Pineville-VA-1.jpg)
REPLACE BOILER PLANT – PINEVILLE, LA
REPLACE BOILER PLANT PINEVILLE, LA Contract: 36C10F20C0017 BRIEF DESCRIPTION The project involves a comprehensive renovation and expansion of the existing
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Lab-Renovation-image-1.jpg)
LAB RENOVATION – FT MEADE, MD
LAB RENOVATION FT MEADE, MD W9127S-20-D-6010 BRIEF DESCRIPTION Project Description: Design, Renovation, and Alteration of Medical Facilities at Ft. Meade,
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/PAM-36-Beds-1.jpg)
PAM 36 BEDS – GEORGETOWN, DE
PAM 36 BEDS GEORGETOWN, DE 19005 BRIEF DESCRIPTION Construction and Renovation of Medical Facility This project involves constructing and renovating