Dams
![](https://www.titanconsultants.com/wp-content/uploads/2024/06/asset-generation-c4dba96d-dc43-44e7-a41f-1d26ace35b04-1-small.jpg)
DENISON DAM- DENISON, TX
DENISON DAM- DENISON, TX W912BV22C0011 BRIEF DESCRIPTION Client: Denison Dam – Denison, TXIndustry: Dam Contractor Details: Contractor: Amerind Contract Number:
![](https://www.titanconsultants.com/wp-content/uploads/2024/06/asset-generation-872564dc-acf0-4962-bac7-bb296816fc7e-3-small.jpg)
NOAA MANCHESTER SEAWATER SYSTEM- SEATTLE, WA
NOAA SEAWATER SYSTEM CENTER- SEATTLE, WA 1305M42FNAAJ132 BRIEF DESCRIPTION Client: NOAA Manchester Seawater System – Seattle, WAIndustry: Infrastructure Contractor Details:
![](https://www.titanconsultants.com/wp-content/uploads/2024/06/asset-generation-7e3faea8-4fea-4e43-8409-09e35de64f3c-1-small.jpg)
Wolf Creek Dam – Russell County, KY
WOLF CREEK DAM- RUSSEL COUNTY, KY W912P521D0002 BRIEF DESCRIPTION Overview The Wolf Creek Dam, located in Russell County, Kentucky, is
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/sam-ray1-1.jpg)
DENISON DAM – DENISON, TX
DENISON DAM DENISON, TX W912BV-22-C-0011 BRIEF DESCRIPTION 480V Distribution System Replacement Project Project Overview The project involves the comprehensive replacement
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Dolphin-Replacement-1.jpg)
DOLPHIN REPLACEMENT – NEW ORLEANS, LA
DOLPHIN REPLACEMENT NEW ORLEANS, LA W912P8-19-C-0073 BRIEF DESCRIPTION Dolphin Construction and Guide Wall Replacement Project Project Overview This project involves
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/MCCs-Big-Bend-Dam-image-1.jpg)
MCCS – BIG BEND DAM, SD
MCCS BIG BEND DAM, SD W9128F-21-P-0006 BRIEF DESCRIPTION Big Bend Motor Control Center (MCC) Replacement Project Project Overview The Big
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/pickwick2-60-1.jpg)
PICKWICK DAM – COUNCE, TN
PICKWICK DAM COUNCE, TN W912P5-17-C-0010 BRIEF DESCRIPTION USACE Pickwick Lock and Dam Mooring Cell Replacement Project Project Overview The project
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/1-58-1.jpg)
NPE-3 & NSE-3 CLOSURES – POMEROY, WA
NPE-3 & NSE-3 CLOSURES POMEROY, WA W912EF-17-B-0016 BRIEF DESCRIPTION Adult Fishway Entrances NSE-3 and NPE-3 were permanently sealed with reinforced
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/johnday1-51-1.jpg)
500 KV REPLACEMENT – UMATILLA, OR
500 KV REPLACEMENT UMATILLA, OR W9127N-17-C-0006 BRIEF DESCRIPTION Replace the existing 500kV group-operated switches ZU1, ZU2, ZU3 and ZU4 with
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/JohnKerrDam-26-1.jpg)
SYSTEMS REPLACEMENTS – JOHN KERR DAM, VA
SYSTEMS REPLACEMENTS JOHN KERR DAM, VA W9127S-17-C-0007 BRIEF DESCRIPTION The project involved removing and disposing of the existing 480VAC Motor
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Guajataca-dam3_compressed-64-1.jpg)
SLUICE GATE – GUAJATACA DAM, PR
SLUICE GATE GUAJATACA DAM, PR W912EP-18-C-0015 BRIEF DESCRIPTION The tight channel was challenging, especially with large dredging materials and vessels.
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/the-dalles-1-25-1.jpeg)
ARC FLASH REDUCTION – THE DALLES, OR
ARC FLASH REDUCTION THE DALLES, OR W9127N-18-C-0008 BRIEF DESCRIPTION Arc Flash Hazard Mitigation Project at The Dalles Project Overview The
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/ice-harbor-dam1-14-1.jpg)
ELECTRICAL UPGRADES – ICE HARBOR DAM, WA
ELECTRICAL UPGRADES ICE HARBOR DAM, WA W19EF-18-C-0020 BRIEF DESCRIPTION Ice Harbor Dam Project Overview Project Description The Ice Harbor Dam
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/james1-proj-9-1.jpg)
SUMP SYSTEMS – NORFORK DAM, AR
SUMP SYSTEMS NORFORK DAM, AR W9127S-19-C-0004 BRIEF DESCRIPTION Norfork Dam Replacement and Upgrades Project Overview Project Description The Norfork
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/4-1-scaled-1-1.jpg)
SUMP PUMP REHABILITATION – BULL SHOALS, AR
SUMP PUMP REHABILITATION BULL SHOALS, AR W9127S-18-C-0010 Previous slide Next slide BRIEF DESCRIPTION Sump Pump System Replacement and Upgrades Project
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/Bridge-Crane-Rehab-RS-Kerr-1.jpg)
BRIDGE CRANE REHAB – RS KERR, OH
BRIDGE CRANE REHAB RS KERR, OH W9128F-18-D-0051 BRIEF DESCRIPTION Special Maintenance and Repair Services for Cranes, Hoists, and Lifting Devices
![](https://www.titanconsultants.com/wp-content/uploads/2023/12/albeni-1.jpg)
ELECTRICAL UPGRADES – ALBENI FALLS DAM, ID
ELECTRICAL UPGRADES ALBENI FALLS DAM, ID BRIEF DESCRIPTION Albeni Falls Transformer and Panelboard Replacement Project Project Overview This project involves