Skip to content
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM
  • BLOG
  • Trade Partners
  • CONTACT
  • CAREERS
    • SITE SAFETY & HEALTH OFFICER (SSHO)
    • CONSTRUCTION QUALITY CONTROL (QC) MANAGER
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM

MCLB HURRICANE REPAIR
ALBANY, GA N62470-13-D6019

BRIEF DESCRIPTION

Project Overview

The Facility Damage Assessment and Restoration project aims to restore and refurbish facilities that have suffered damage. This comprehensive project involves conducting detailed damage assessments, removing and replacing damaged materials, and performing necessary repairs to ensure the facility is returned to its optimal condition.

Scope of Work

Damage Assessment:

  • Site Visits: Conduct thorough damage assessment site visits with government personnel to evaluate the extent of damage at the facility. These assessments will identify all areas requiring attention and determine the scope of restoration work needed.

Cleanup and Removal:

  • Damaged Materials and Furniture: Clean up and remove all damaged materials and furniture from the facility. This includes ensuring safe disposal or recycling of materials as per environmental regulations.

Repairs and Replacements:

  1. Wall Repairs:

    • Structural and Cosmetic Repairs: Repair any structural damage to walls and restore them to their original condition, including patching holes, repainting, and refinishing surfaces.
  2. Flooring:

    • Removal and Replacement: Remove damaged flooring and replace it with new materials that match the existing or specified design. This may include installing tiles, carpets, hardwood, or other flooring types.
  3. Doors:

    • Repair or Replacement: Repair or replace damaged or missing doors to ensure security and functionality. This includes repairing door frames, hinges, and locks as necessary.
  4. Security Systems:

    • System Repairs: Repair damaged security systems to restore full operational capacity. This may involve fixing cameras, sensors, alarms, and control panels to ensure the facility is secure.
  5. Glass and Windows:

    • Broken Glass Replacement: Replace broken glass panes in windows and doors to restore visibility and security. Ensure that all replacements meet safety and building code standards.
  6. Ceiling Tiles:

    • Removal and Replacement: Remove and replace damaged ceiling tiles to maintain the aesthetic and functional integrity of the facility’s ceilings.
  7. Furniture Replacement:

    • New Furniture Installation: Replace damaged furniture with new items that match the facility’s requirements and design preferences. This includes sourcing, delivering, and installing the new furniture.

Environmental and Safety Considerations

Safe Disposal:

  • Environmental Compliance: Ensure all removed materials, including hazardous waste, are disposed of in accordance with environmental regulations to minimize impact on the environment.

Health and Safety:

  • Worksite Safety: Implement strict safety protocols to protect workers and facility occupants during the cleanup and restoration process. This includes using personal protective equipment (PPE) and following safety guidelines.

Quality Control and Assurance

Inspection and Monitoring:

  • Regular Inspections: Conduct regular inspections throughout the project to ensure all work meets quality standards and project specifications.
  • Compliance: Ensure all repairs and replacements comply with relevant building codes, safety standards, and client requirements.

Documentation:

  • Detailed Records: Maintain comprehensive records of damage assessments, repair activities, and quality control measures. Provide detailed reports to the client to ensure transparency and accountability.

Conclusion

The Facility Damage Assessment and Restoration project is a critical initiative to restore damaged facilities to their original condition. Through meticulous damage assessments, thorough cleanup, and comprehensive repairs and replacements, the project aims to ensure the facility is safe, functional, and aesthetically pleasing. With a strong focus on environmental compliance, safety, and quality control, the project will deliver high-quality results that meet client expectations and industry standards.

AT A GLANCE

TITAN RoleSite Safety & Health Officer (SSHO)
ClientConti Federal Services
Contract Price$63,628,104

SSHO (Site Safety and Health Officer) Scope of Work

  • Safety Management:
    Implement and oversee the site-specific safety plan.
  • Inspections:
    Conduct daily safety inspections and audits.
  • Training:
    Provide safety training and ensure compliance with safety protocols.
  • Incident Response:
    Respond to and investigate safety incidents and accidents.
  • Documentation:
    Maintain safety records and reports.

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.

Cleantalk Pixel