Skip to content
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM
  • BLOG
  • Trade Partners
  • CONTACT
  • CAREERS
    • SITE SAFETY & HEALTH OFFICER (SSHO)
    • CONSTRUCTION QUALITY CONTROL (QC) MANAGER
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM

CLEAR LAKE- NASA 80SSC018D0020/ 80JSC023F0122

BRIEF DESCRIPTION

The “Clear Lake – NASA Construction Project” is an essential initiative to enhance the infrastructure and capabilities of NASA’s facilities in the Clear Lake area. This project is part of NASA’s ongoing efforts to maintain and upgrade its facilities to support its space exploration, research, and innovation mission.

Project Scope and Objectives

The Clear Lake project involves a series of construction activities designed to improve the operational efficiency, safety, and functionality of NASA’s infrastructure in the area. Key objectives of the project include:

  • Infrastructure Upgrades:

    • We are modernizing existing buildings and facilities to meet technological and safety standards.
    • It is enhancing energy efficiency through the installation of advanced systems and materials.
    • We are expanding our capacity to accommodate future missions and research activities.
  • Safety Improvements:

    • We are implementing state-of-the-art safety systems to protect personnel and equipment.
    • We are upgrading emergency response capabilities and infrastructure.
  • Operational Enhancements:

    • We are streamlining workflows and operational processes through the redesign of critical facilities.
    • We are integrating new technologies to support NASA’s evolving needs and mission requirements.

Contractor and Coordination

  • Contractor: Bristol Bay

    • Bristol Bay, a reputable contractor with extensive experience in large-scale infrastructure projects, has been selected to execute this critical construction project. Known for its expertise and reliability, Bristol Bay will ensure that all construction activities are completed to the highest standards.

Timeline and Milestones

  • Original End Date:

    • The project was initially scheduled for completion by June 25, 2024 (25/06/2024).
  • New End Date:

    • The completion date has been revised to June 30, 2024 (30/06/2024), allowing additional time to ensure all project aspects are thoroughly addressed and executed perfectly.

Contact Details

  • Contract Numbers: 80SSC018D0020 / 80JSC023F0122
    • These contract numbers represent the formal agreements under which the project is executed. They serve as unique identifiers for tracking and administrative purposes.

Quality Assurance

  • Industrial Classification:

    • The project is classified under industrial construction, reflecting its complexity and the technical demands of upgrading and expanding NASA’s facilities.
  • Quality Control Manager (QCM): [QCM Name]

    • The Quality Control Manager (QCM) is responsible for ensuring that all construction activities adhere to the highest quality and safety standards. The QCM conducts regular inspections, oversees testing procedures, and verifies compliance with all relevant regulations.

Significance of the Project

The Clear Lake – NASA Construction Project is a vital initiative for several reasons:

  • Supporting Space Exploration:

    • By upgrading its facilities, NASA ensures that it remains at the forefront of space exploration and research, capable of supporting future missions and scientific advancements.
  • Enhancing Research Capabilities:

    • Improved infrastructure supports ongoing and future research projects, enabling scientists and engineers to work more efficiently and effectively.
  • Economic Impact:

    • The construction project benefits the Clear Lake area economically through job creation and increased demand for local services and materials.
  • Environmental Stewardship:

    • The project contributes to NASA’s commitment to environmental sustainability by incorporating energy-efficient technologies and sustainable practices.

Conclusion

The Clear Lake – NASA Construction Project represents a significant investment in the future of space exploration and research. Managed by the skilled contractor Bristol Bay and coordinated by Phillips, the project aims to enhance NASA’s infrastructure, ensuring it can continue leading the world in scientific discovery and innovation. With a focus on safety, efficiency, and sustainability, this project will provide the foundation for NASA’s ongoing and future endeavors.

AT A GLANCE

Project TypeInfrastructure
TITAN RoleSITE SAFETY AND HEALTH OFFICER
ClientBristol Bay
Completion Date06/30/2024

SITE SAFETY AND HEALTH OFFICER SCOPE OF WORK

  • Conduct daily safety and health inspections, maintaining a log of inspected areas, dates, hazards, corrective actions, and completion dates. Submit daily reports to the QC Manager.
  • Conduct mishap investigations, complete accident reports, and report near misses.
  • Use and maintain OSHA’s Form 300 to log work-related injuries and post Form 300A on the site safety bulletin board.
  • Attend pre-construction, mutual understanding, three-phase quality, and progress meetings.
  • Review, approve, implement, and enforce the APP and Accident Hazard Awareness (AHAs) for compliance with EM 385-1-1.
  • Maintain applicable safety reference materials on-site.
  • Establish and maintain a safety deficiency tracking system.
  • Maintain a list of hazardous chemicals and their Safety Data Sheets (SDSs).
  • Maintain a weekly list of high-hazard activities and be prepared to discuss details during Quality Control Progress Meetings.

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.

Cleantalk Pixel