TAXIWAY D & B2 REPAIR
W-P AFB, OH W912QR-19C-0013

BRIEF DESCRIPTION

The project consists of full depth replacement of Taxiway D and B2 as well as overlay of the short runways, details on each project below: Taxiway D & B2: Repair by replacement Taxiway D sections T11C and T28C between Taxiway B and Runway 05R- 23L, and Taxiway B1 sections T12C and T29C between Taxiway B and the East Ramp. Work includes excavation, subgrade and subbase work, full-depth concrete replacement, and increasing the width of the taxiways from 50′ to 75′. Repair the underdrain system running parallel to the taxiways and re-connect the underdrains to the storm sewer system.

AT A GLANCE

 
TITAN RoleSite Safety & Health Officer (SSHO)
ClientAnthony Allega Cement Contractor Inc.
Contract Price$13,770,342