Sandy Hook Federal Navigation Channel Maintenance
W912DS-22-B-0013 | W912DS-25-C-A018

Sandy Hook Federal Navigation Channel Maintenance

Nighttime USACE Quality Control Management & Compliance Oversight

Titan Consultants delivers specialized Quality Control Management (QCM) for complex marine construction. In partnership with Norfolk Dredging Company, our team provided critical oversight for the maintenance dredging of the Sandy Hook Federal Navigation Channel, a vital maritime artery for the New York and New Jersey harbor systems.

Project Specifications & Scope of Sandy Hook Federal Navigation                                    
  • Contract Numbers: W912DS-22-B-0013 | W912DS-25-C-A018
  • Client/Prime: Norfolk Dredging Company / USACE New York District
  • Location: Sandy Hook, New Jersey (Federal Navigation Channel)
  • Scope: Removal of 200,000 cubic yards of sand/gravel to -35 feet MLLW.
  • Sustainability: Strategic placement at the Sea Bright Offshore Borrow Area (SBOBA) for coastal resiliency.

The Titan Role: Specialized Nighttime QCM Services

 
Large-scale dredging requires 24/7 operational continuity. Titan Consultants filled the critical Nighttime Quality Control Manager role, ensuring that production never outpaced compliance.
 
1. USACE Quality Control (QCS/RMS 3.0)
Our QCM experts managed all nighttime reporting requirements through the Resident Management System (RMS 3.0). We ensured that daily reports, production volumes, and hydrographic survey data were accurately logged and synchronized with USACE requirements, preventing administrative bottlenecks and ensuring timely progress payments.
 
2. EM 385-1-1 Safety & Health Oversight
Safety risks escalate during night operations. Titan maintained a vigilant presence to ensure strict adherence to USACE EM 385-1-1 safety standards. Our oversight included:
  • Nighttime crew transfer safety.
  • Proper marine lighting and signaling compliance.
  • Hazard recognition for dredging in high-traffic navigation channels.
 
3. Technical Performance & Environmental Monitoring
We monitored dredging accuracy to ensure the contractor stayed within the authorized horizontal and vertical pay limits. By providing real-time quality checks on the night shift, we helped the prime contractor avoid “redredging” and ensured the precise placement of materials at the Sea Bright Offshore Borrow Area (SBOBA).
 

 
Project Achievements
  • Zero Safety Incidents: Achieved a perfect safety record during nighttime operations.
  • Total Compliance: 100% adherence to USACE Quality Control specifications.
  • Operational Efficiency: Facilitated 24/7 production, allowing the project to meet strict seasonal environmental windows.
 
Expert Federal Contracting Support
Titan Consultants understands the rigors of federal marine construction. From dredging oversight to specialized SSHO roles, we ensure your project meets every federal requirement.
Contact Titan Consultants Today to discuss QCM/SSHO support for your next USACE or NAVFAC bid.