ROCKAWAY GROINS – QUEENS, NY

ROCKAWAY GROINS QUEENS, NY W912DS-20-C-0015 Previous slide Next slide BRIEF DESCRIPTION Work is for the Hurricane Sandy Coastal Storm Risk Reduction efforts. Work is to run from east Rockaway Inlet to Jamaica Bay. Overall project consists of 14 new stone groin structures and 5 groin rehabilitations for the primary purpose of storm risk reduction efforts. […]

MCLB HURRICANE REPAIR – ALBANY, GA

MCLB HURRICANE REPAIR ALBANY, GA N62470-13-D6019 BRIEF DESCRIPTION Scope of work includes: Conduct damage assessment site visits to determine the extent of the damage at the facility with government personnel, clean up and remove damaged materials and furniture from the facility, repair walls, remove and replace flooring, repair, or replace damaged/missing doors, repair security systems, […]

DELAWARE DEEPENING – CHESTER, PA

DELAWARE DEEPENING CHESTER, PA W9123622B5012 BRIEF DESCRIPTION Deepening dredging project consisting of the removal of 1M+ c.y. of dredged material along the Delaware River located outside of Philadelphia, PA. Dredged material to be removed will be removed offsite. Deepening project will allow for larger vessels to travel through the Delaware River, increasing commerce in the […]

PHILLY TO SEA – CHESTER, PA

PHILLY TO SEA CHESTER, PA W912BU-21-C-0007 Previous slide Next slide BRIEF DESCRIPTION Maintenance dredging of the Delaware Channel includes dredging up to 25′ outside the channel edge. Approximate yardage of dredged material is 800,000 yds in Bellvue/Cherry Island, 500,000 yds at Deepwater Point, 650,000 yds at New Castle, and 700,000 yds in other areas. AT […]

MAINTENANCE DREDGING AIWW – WILMINGTON, NC

AIWW MAINTENANCE WILMINGTON, NC (CONTRACT 1) W912EP-19-D-0044 BRIEF DESCRIPTION Maintenance Dredging of the Atlantic Intracoastal Waterway (AIWW) channel between Morehead City and Shallotte, North Carolina.  The maintenance dredging work will consist of removal of shoaled material that has accumulated in the channels since the various areas were last dredged.  Dredging depth is 12’ plus 2’ […]

HUDSON RIVER DREDGING – ALBANY, NY

HUDSON RIVER DREDGING ALBANY, NY W912DS-21-C-C-0008 Previous slide Next slide BRIEF DESCRIPTION Maintenance Dredging of approximately 36k cubic yards of shoals within the federal navigational channel. Material is primarily silt and clay and was removed via mechanical dredging. Material was considered contaminated, processed, cleaned, and is available to be placed back into the environment. AT A […]

DELAWARE RIVER MAINTENANCE PHILA TO TRENTON, PHILADELPHIA, PA

MAINTENANCE DREDGING PHILADELPHIA, PA W912BU-15-C-0048 https://www.titanconsultants.com/wp-content/uploads/2023/12/516909134-1.mp4 BRIEF DESCRIPTION This project involves removing 127,000 c.y of soft sandy material along a portion of the Delaware River between Philadelphia, PA to Trenton, NJ. Logistics consisted of removing the material with a clamshell dredge, transporting the material down river, and unloading the material at a nearby unloading site. […]

BEACH NOURISHMENT – PECK BEACH, NJ

BEACH NOURISHMENT PECK BEACH, NJ W912BU-15-C-0042 BRIEF DESCRIPTION The tight channel was challenging, especially with large dredging materials and vessels. Southwind used hydraulic dredging to pump the materials out of the shallow lagoons through a pipeline to a disposal facility, known as Site 83, off Roosevelt Boulevard. Southwind has a $2.1 million contract, but about […]

MAINTENANCE DREDGING MENEMSHA HARBOR MARTHA’S VINEYARD

HARBOR DREDGING MARTHA’S VINEYARD, MA W912WJ-15-C-0016 BRIEF DESCRIPTION H & L Dredging replaced J-Way Southern on this project to dredge the remaining sandy shoal material in the Menemsha Creek Federal navigation project (FNP) in Aquinnah and Chilmark, Martha’s Vineyard, Mass.  H & L Dredging, of Bay Shores, New York, has successfully completed other hydraulic dredging […]