THE DALLES DAM OIL ACCOUNTABILITY MEASURES COLUMBIA RIVER OREGON W9127N-19-C-0024

THE DALLES DAM OIL ACCOUNTABILITY MEASURES The Dalles Lock and Dam | Columbia River, Oregon

THE DALLES DAM OIL ACCOUNTABILITY MEASURES-OREGON W9127N-19-C-0024 BRIEF DESCRIPTION Titan Consultants & Engineers provided Site Safety and Health Officer (SSHO) oversight for the Dalles Dam construction project at The Dalles Lock and Dam on the Columbia River in Oregon. The project was executed under Contract No. W9127N-19-C-0024, with Knight Construction & Supply, Inc. serving as […]

FREEPORT HARBOR DREDGING- TEXAS- W912HY-23-C-0005

Freeport Harbor Dredging(Texas)  W912HY-23-C-0005 BRIEF DESCRIPTION Project Overview for Freeport Harbor Channel Improvement Project The Freeport Harbor Channel Improvement Project is a transformative infrastructure initiative valued at approximately $157 million under Contract Number W912HY-23-C-0005. Awarded to Great Lakes Dredge & Dock Co. (GLDD) by the U.S. Army Corps of Engineers (USACE) Galveston District, the project […]

THE DALLES DAM- OREGON- W9127N-19-C-0024

THE DALLES DAM- OREGONW9127N-19-C-0024 BRIEF DESCRIPTION At Titan Consultants, we are proud to have supported the U.S. Army Corps of Engineers – Portland District through our work on the Dalles Dam Project in Oregon under Contract W9127N-19-C-0024. Partnering with Knight Construction, our team provided a qualified Site Safety and Health Officer (SSHO) to ensure full […]

Wolf Creek Dam-North America W9127S24P0083

Wolf Creek Dam-North America W9127S24P0083 BRIEF DESCRIPTION Reivax North America has secured a pivotal contract from the U.S. Army Corps of Engineers (USACE) to modernize the excitation systems at the Wolf Creek Dam hydroelectric facility in Kentucky. This comprehensive, turn-key project aims to enhance the facility’s operational efficiency and long-term reliability by replacing the outdated […]

DENISON DAM- DENISON, TX

DENISON DAM- DENISON, TX W912BV22C0011 BRIEF DESCRIPTION Client: Denison Dam – Denison, TXIndustry: Dam Contractor Details: Contractor: Amerind Contract Number: W912BV22C0011 Project Timeline: Original End Date: 31/07/2024 (July 31, 2024) New End Date: 15/08/2024 (August 15, 2024) Key Roles: Dam: Responsible for overseeing specific aspects of the dam’s structural integrity and water management. Quality Control […]

NOAA MANCHESTER SEAWATER SYSTEM- SEATTLE, WA

NOAA SEAWATER SYSTEM CENTER- SEATTLE, WA 1305M42FNAAJ132 BRIEF DESCRIPTION Client: NOAA Manchester Seawater System – Seattle, WAIndustry: Infrastructure Contractor Details: Contractor: Prospect Construction Contract Number: 1305M42FNAAJ132 Project Timeline: Original End Date: 15/09/2024 (September 15, 2024) New End Date: 15/10/2023 (October 15, 2023) Key Roles: Dam: Responsible for overseeing specific aspects of the project related to […]

Wolf Creek Dam – Russell County, KY

WOLF CREEK DAM- RUSSEL COUNTY, KY W912P521D0002 BRIEF DESCRIPTION Overview The Wolf Creek Dam, located in Russell County, Kentucky, is undergoing a significant rehabilitation project to enhance its structural integrity and operational efficiency. This project is a critical effort to ensure the dam continues to provide essential services, including flood control, water supply, and hydroelectric […]

DENISON DAM – DENISON, TX

DENISON DAM DENISON, TX W912BV-22-C-0011 BRIEF DESCRIPTION 480V Distribution System Replacement Project Project Overview The project involves the comprehensive replacement of a 480V distribution system. This includes demolishing existing equipment and structures, installing new and updated equipment, various electrical upgrades, and thorough performance and maintenance checks to ensure the system operates efficiently and reliably. Scope […]

DOLPHIN REPLACEMENT – NEW ORLEANS, LA

DOLPHIN REPLACEMENT NEW ORLEANS, LA W912P8-19-C-0073 BRIEF DESCRIPTION Dolphin Construction and Guide Wall Replacement Project Project Overview This project involves the comprehensive demolition and replacement of existing timber guide walls and concrete and steel pile cellular dolphins. It includes the construction of a new concrete bullnose dolphin and related incidental work to enhance the structural […]

MCCS – BIG BEND DAM, SD

MCCS BIG BEND DAM, SD W9128F-21-P-0006 BRIEF DESCRIPTION Big Bend Motor Control Center (MCC) Replacement Project Project Overview The Big Bend MCC Replacement Project involves the comprehensive replacement of multiple Motor Control Centers (MCCs) and panelboards throughout the facility. The project aims to upgrade existing electrical equipment with modern solutions that meet or exceed current […]