DENISON DAM- DENISON, TX

DENISON DAM- DENISON, TX W912BV22C0011 BRIEF DESCRIPTION Client: Denison Dam – Denison, TXIndustry: Dam Contractor Details: Contractor: Amerind Contract Number: W912BV22C0011 Project Timeline: Original End Date: 31/07/2024 (July 31, 2024) New End Date: 15/08/2024 (August 15, 2024) Key Roles: Dam: Responsible for overseeing specific aspects of the dam’s structural integrity and water management. Quality Control […]

NOAA MANCHESTER SEAWATER SYSTEM- SEATTLE, WA

NOAA SEAWATER SYSTEM CENTER- SEATTLE, WA 1305M42FNAAJ132 BRIEF DESCRIPTION Client: NOAA Manchester Seawater System – Seattle, WAIndustry: Infrastructure Contractor Details: Contractor: Prospect Construction Contract Number: 1305M42FNAAJ132 Project Timeline: Original End Date: 15/09/2024 (September 15, 2024) New End Date: 15/10/2023 (October 15, 2023) Key Roles: Dam: Responsible for overseeing specific aspects of the project related to […]

Wolf Creek Dam – Russell County, KY

WOLF CREEK DAM- RUSSEL COUNTY, KY W912P521D0002 BRIEF DESCRIPTION Overview The Wolf Creek Dam, located in Russell County, Kentucky, is undergoing a significant rehabilitation project to enhance its structural integrity and operational efficiency. This project is a critical effort to ensure the dam continues to provide essential services, including flood control, water supply, and hydroelectric […]

DENISON DAM – DENISON, TX

DENISON DAM DENISON, TX W912BV-22-C-0011 BRIEF DESCRIPTION 480V Distribution System Replacement Project Project Overview The project involves the comprehensive replacement of a 480V distribution system. This includes demolishing existing equipment and structures, installing new and updated equipment, various electrical upgrades, and thorough performance and maintenance checks to ensure the system operates efficiently and reliably. Scope […]

DOLPHIN REPLACEMENT – NEW ORLEANS, LA

DOLPHIN REPLACEMENT NEW ORLEANS, LA W912P8-19-C-0073 BRIEF DESCRIPTION Dolphin Construction and Guide Wall Replacement Project Project Overview This project involves the comprehensive demolition and replacement of existing timber guide walls and concrete and steel pile cellular dolphins. It includes the construction of a new concrete bullnose dolphin and related incidental work to enhance the structural […]

MCCS – BIG BEND DAM, SD

MCCS BIG BEND DAM, SD W9128F-21-P-0006 BRIEF DESCRIPTION Big Bend Motor Control Center (MCC) Replacement Project Project Overview The Big Bend MCC Replacement Project involves the comprehensive replacement of multiple Motor Control Centers (MCCs) and panelboards throughout the facility. The project aims to upgrade existing electrical equipment with modern solutions that meet or exceed current […]

PICKWICK DAM – COUNCE, TN

PICKWICK DAM COUNCE, TN W912P5-17-C-0010 BRIEF DESCRIPTION USACE Pickwick Lock and Dam Mooring Cell Replacement Project Project Overview The project involved demolishing and constructing a new mooring cell at Pickwick Lock and Dam. The work included removing an existing mooring cell and installing a new one of the exact dimensions within the original footprint. Scope […]

NPE-3 & NSE-3 CLOSURES – POMEROY, WA

NPE-3 & NSE-3 CLOSURES POMEROY, WA W912EF-17-B-0016 BRIEF DESCRIPTION Adult Fishway Entrances NSE-3 and NPE-3 were permanently sealed with reinforced self-consolidating concrete at Lower Granite Dam. These openings are side entrances to the adult ladder that are no longer used. The two entrances are partially under water so it is expected these areas will require […]

500 KV REPLACEMENT – UMATILLA, OR

500 KV REPLACEMENT UMATILLA, OR W9127N-17-C-0006 BRIEF DESCRIPTION Replace the existing 500kV group-operated switches ZU1, ZU2, ZU3 and ZU4 with surge resistors and grounding switches, and to construct and install the platforms and walkways and incidental related work. The includes the following: Preparation of new mounting provisions for 500kV group-operated disconnect switches with surge resistors […]

SYSTEMS REPLACEMENTS – JOHN KERR DAM, VA

SYSTEMS REPLACEMENTS JOHN KERR DAM, VA W9127S-17-C-0007 BRIEF DESCRIPTION The project involved removing and disposing of the existing 480VAC Motor Control Center (MCC) and installing a new MCC, including starters, controls, and redundant feeder circuit breakers. The replacement was required for Auxiliary Distribution Board No. 1. Scope of Work Demolition and Disposal: Removal of Existing […]