Skip to content
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM
  • BLOG
  • Trade Partners
  • CONTACT
  • CAREERS
    • SITE SAFETY & HEALTH OFFICER (SSHO)
    • CONSTRUCTION QUALITY CONTROL (QC) MANAGER
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM

PLANTEX PLANT FIBER OPTICS 81522

BRIEF DESCRIPTION

The scope of work encompasses a comprehensive range of tasks to be undertaken at the Pantex facility, ensuring a seamless and efficient upgrade. Key activities include:

  1. Installation of New Fiber Optic Line:

    • Design and deployment of advanced fiber optic infrastructure to enhance communication capabilities.
    • Integration of state-of-the-art technology to support high-speed data transmission.
    • Coordination with stakeholders to minimize disruption during installation.

2. Demolition of Portions of the Facility:

  • Strategic dismantling of designated areas to make way for new construction.
  • Safe removal of obsolete structures in compliance with environmental and safety regulations.
  • Efficient disposal and recycling of demolition debris.

3. Flooring Repair and Other Renovations:

  • Comprehensive assessment and repair of damaged flooring to restore functionality and aesthetics.
  • Implementation of modern flooring solutions to ensure durability and safety.
  • Additional renovations, including painting, lighting, and HVAC improvements, will enhance the facility’s overall environment.

4. Relocation of Existing Equipment and Furniture:

  • Detailed planning and execution of equipment and furniture relocation to minimize downtime.
  • Secure handling and transport of sensitive and valuable assets.
  • Reinstallation and configuration of equipment to ensure optimal performance in the new setup.

By undertaking these tasks, the project aims to modernize the Pantex facility and create a more efficient, safe, and productive environment for all users.

AT A GLANCE

TITAN RoleQuality Control (QC) Manager
ClientSAMES Engineering

QCM (Quality Control Manager) Scope of Work
Project Oversight:

  • Monitor all project activities to ensure compliance with quality standards.
  • Inspections:
    Conduct regular inspections to verify work meets specified requirements.
  • Documentation:
    Maintain accurate records of inspections, tests, and quality control measures.
  • Reporting:
    Prepare and submit quality reports to project stakeholders.
  • Problem Resolution:
    Identify quality issues and coordinate corrective actions.

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.

Cleantalk Pixel