Skip to content
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM
  • BLOG
  • Trade Partners
  • CONTACT
  • CAREERS
    • SITE SAFETY & HEALTH OFFICER (SSHO)
    • CONSTRUCTION QUALITY CONTROL (QC) MANAGER
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM

AIRFORCE HANGER RENOVATION
BEALE AFB, CA W912QR-17-C-0004

BRIEF DESCRIPTION

 

The renovation of the existing aircraft hangar, B1076, Dock 5, at Beale AFB, CA, is a comprehensive project aimed at transforming the facility to support the maintenance and repair of the KC-135 aircraft. The scope of construction work includes the following:

  1. Demolition:

    • Removal of a 1-story office area.
    • Demolition of two interior structures.
  2. New Construction:

    • Building new interior structures that will house small repair shops, conference and training rooms, restrooms, and various administrative support offices.
  3. Floor and Paint Work:

    • Re-coating of the hangar floor.
    • Painting the entire hangar, covering all structures and walls up to the bottom of the truss or the bottom of the PEMB (Pre-Engineered Metal Building) girder.
  4. System Replacements:

    • Replacement of the HVAC system.
    • Installation of a new metal roof panel.
    • Implementation of new fire suppression and fire protection systems.
    • Upgrading electrical and telecommunications infrastructure for the new administrative and support spaces.
    • Replacement of fire alarm systems throughout the facility.
    • Installation of a new lightning protection system.
  5. Fire Suppression System:

    • Installation of new pumps at a remote pump house.
    • Limited fire suppression system work in surrounding hangars.
    • Upgrading the existing fire alarm system in an adjacent administrative area.
  6. Site Work:

    • Selective demolition of the site.
    • Patch and repair work for utility connections.

TITAN Consultants played a crucial role in this project by providing essential personnel, including a Quality Control Manager, a Submittal Clerk, and a Site Safety and Health Officer (SSHO). These roles were vital in ensuring that the renovation work met the required standards and was completed efficiently and safely.

AT A GLANCE

 
Project TypeGovernment
TITAN RoleSite Safety & Health Officer (SSHO) & Quality Control (QC) Manager and Submittal Clerk
ClientAMG & Associates, Inc.
Completion DateSeptember 2018
Contract Price11,763,000
 

QUALITY CONTROL MANAGER SCOPE OF WORK

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests, including documentation
  • Coordination of project logistics, materials, and equipment
  • Managing the day-to-day quality control activities
  • Kept designated personnel and management staff apprised of the status of work
  • Ensured all reports were prepared and submitted by the QC Plan, including the Daily Quality Control Reports
  • Maintained all the project quality control files
  • Reported and logged any work not meeting Spec requirements
  • Recorded all data in the QCS database

SITE SAFETY AND HEALTH OFFICER SCOPE OF WORK

  • Maintained MSDS to ensure no hazardous items were brought onto the job site
  • Enforced USACE EM 385-1-1 and held the project to OSHA standards
  • Maintained MSDS to ensure no dangerous items were brought onto the job site
  • Managed all phases of safety control
  • Conducted daily safety inspections
  • Conducted daily safety briefings and weekly toolbox talks
  • Kept list of deficient safety items and maintained list until all safety deficiencies were addressed
  • Coordinated with USACE QA on-site all safety items
  • Ensured public safety with additional warning signs and barriers
  • Maintained OSHA 300 Form and Daily Production reports
  • Kept photo logs of all safety issues
  • Attended pre-construction conferences and pre-work meetings, including preparatory inspection meetings and periodic in-progress meetings
  • Enforced accepted APPS and AHAs
  • Spoke to local businesses and discussed safety issues with their patrons with our current operations

The Submittal Clerk’s responsibilities include:

  • Organizing and maintaining project documents. Filing and ensuring accessibility of documents.
  • We collect and review submittals from subcontractors and submit documents for approval. We also track submission statuses, liaise with the project team, subcontractors, and suppliers, and communicate submittal requirements and updates.
  • Ensuring submittals meet project standards and specifications.Verifying materials and products.
    Assisting with quality control documentation.Maintaining and archiving approved submittals.Ensuring submittals follow regulatory and safety standards.

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.

Cleantalk Pixel