Long Island Beach Nourishment Project
The Long Island Beach Nourishment Project encompasses an extensive 19-mile stretch of beach, spanning from Robert Moses State Park on the west end to Smith County Park at the east end of the island. This ambitious project involves removing and placing approximately 1 million cubic yards of material along the Long Island coastline, aimed at enhancing beach resilience and protecting coastal infrastructure.
Project Overview
Geographical Scope:
- Robert Moses State Park to Smith County Park: The project covers a vast area, ensuring that the nourishment efforts benefit key sections of Long Island’s coastline. This stretch is critical for recreational purposes and a protective barrier against storm surges and erosion.
Material Removal and Placement:
- 1 Million Cubic Yards of Material: The project carefully removes sand and sediment from designated areas and their subsequent placement along the coastline. This process helps restore eroded beaches, improve beach width, and enhance the natural dune systems.
- Long Island Coastline: The placement of this material is strategically planned to maximize the protective benefits and restore the natural beauty of Long IslaIsland’sches.
Environmental and Structural Benefits
- Erosion Control: By replenishing the beaches with new material, the project significantly mitigates the effects of coastal erosion, preserving the shoreline for future generations.
- Storm Protection: The enhanced beach and dune systems provide a natural barrier against storm surges, protecting inland properties and infrastructure from potential damage.
- Recreational Enhancement: The project aims to protect and enhance the recreational value of Long Isla Island, making it more enjoyable for residents and visitors.
Role of Titan Consultants
Quality Control Management Services: Titan Consultants has been entrusted with providing Quality Control (QC) Management Services for this project. Their responsibilities include:
- Oversight and Inspection: Ensuring that all material removal and placement aspects are conducted according to project specifications and environmental regulations.
- Compliance Monitoring: Verifying that the project adheres to all relevant local, state, and federal guidelines, particularly concerning environmental protection and safety standards.
- Quality Assurance: Maintaining high-quality standards throughout the project, from the initial planning stages to the final placement of materials, ensuring the longevity and effectiveness of the beach nourishment efforts.
Conclusion
The Long Island Beach Nourishment Project is a vital initiative for preserving and enhancing the coastline. Through strategic material placement and robust quality control measures provided by Titan Consultants, the project aims to deliver long-term benefits regarding erosion control, storm protection, and recreational value.
AT A GLANCE
| Project Type | Dredging | 
|---|---|
| TITAN Role | Quality Control (QC) Manager | 
| Client | Great Lakes Dredge & Dock | 
| Completion Date | Ongoing | 
| Contract Price | $23.4M | 
QC MANAGER SCOPE OF WORK
- Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation
- Coordination of project logistics, materials and equipment
- Managing the day-to-day quality control activities
- Kept designated personnel and management staff apprised of status of work
- Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Reports
- Maintained all the project quality control files
- Reported and logged any work not meeting Spec requirements
- Recorded all data in QCS database
 
				