Skip to content
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM
  • BLOG
  • Trade Partners
  • CONTACT
  • CAREERS
    • SITE SAFETY & HEALTH OFFICER (SSHO)
    • CONSTRUCTION QUALITY CONTROL (QC) MANAGER
  • Services
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING

    EXPERTISE

    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • SITE SAFETY & HEALTH OFFICERS (SSHOS)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
    PRE-CONSTRUCTION PLANS

    QUALITY CONTROL (QC) MANAGERS

    SITE SAFETY & HEALTH OFFICERS (SSHOS)


    CONSTRUCTION SUPERINTENDENTS

    CONSTRUCTION MANAGEMENT

    GENERAL CONTRACTING

  • Projects
    • Active Projects
    • Completed Projects

    PROJECTS

    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
    GOVERNMENT
    ENVIRONMENTAL

    HOSPITALITY

    INDUSTRIAL
    INFRASTRUCTURE

    DREDGING

    DAMS

    OFFICE

  • Company
    • About Us
    • MEET THE TEAM

    COMPANY

    • MEET THE TEAM
    • ABOUT US
    • TITAN UNIVERSITY
    MEET THE TEAM
    ABOUT US
    TITAN UNIVERSITY
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • QUALITY CONTROL (QC) MANAGERS
    • Site Safety & Health Officers (SSHOs)
    • CONSTRUCTION SUPERINTENDENTS
    • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Education
    • QUALITY CONTROL (QC) MANAGER
      • Contract Administration in RMS
      • Mastering RMS 3.0
      • Submittal Proficiency in RMS 3.0
    • SITE SAFETY & HEALTH OFFICER (SSHO)
      • FREE OSHA 30-Hour Certification (Construction)
      • Accident Investigation and Reporting
      • EM 385-1-1 (8hrs to 40 hrs)
      • Aerial Lift Safety in Construction
      • Asbestos Awareness Training
    • ENVIRONMENTAL MANAGER (EM)
      • Eastern Indigo Snake, Qualified Observer
      • Piping Plover Monitor for Beach Construction
      • Sea Turtle Monitor for Construction
      • West Indian Manatee Observer
    • OCCUPATIONAL HEALTH AND SAFETY SPECIALIST
      • Magnetic Resonance Safety Officer (MRSO) Advanced Training
      • Magnetic Resonance Safety Officer (MRSE) Advanced Training
    • CERTIFIED CONSTRUCTION MANAGER TEST PREP
      • Sustainability Practices
      • Risk Management
      • Contract Administration
  • Company
    • ABOUT US
    • MEET THE TEAM

STONE REVETMENT
HULL, MA W912WJ-18-C-0007

BRIEF DESCRIPTION

Nantasket Beach Armor Stone Revetment Project

The Nantasket Beach Armor Stone Revetment Project focuses on constructing a robust armor stone revetment in Hull, Massachusetts, along Nantasket Beach. This critical project aims to enhance coastal protection and ensure the longevity of the existing seawall by deploying advanced materials and construction techniques.

Project Overview

Revetment Construction Details:

  • Armor Stone Placement: The project involves the placement of armor stone and related materials in front of an existing concrete seawall. The revetment will extend along a continuous length of 2,200 linear feet. Armor stones are designed to absorb and deflect wave energy, protecting the shoreline from erosion and minimizing the impact of storm surges.
  • Large Cut Armor Stones: Special attention will be given to placing large cut armor stones at designated beach access points along the seawall. These stones are integral to maintaining pedestrian access and ensuring the revetment does not obstruct public pathways.

Construction Activities:

  • Preparation and Site Access: Before placing the armor stones, the site will be prepared to ensure a stable foundation for the revetment. This may include removing existing debris and stabilizing the shoreline.
  • Stone Placement: The armor stones will be carefully placed using specialized equipment to ensure proper positioning and alignment. The rocks will be arranged to form a protective barrier while allowing for safe and accessible beach entry points.
  • Beach Access Points: Large-cut armor stones will be positioned at designated locations along the seawall to create stable and accessible pedestrian paths. This ensures that the revetment does not impede beach access and maintains the area’s usability for tharea’sic.

Environmental and Structural Benefits

Coastal Protection:

  • Erosion Control: The armor stone revetment will provide significant protection against coastal erosion, helping to preserve the integrity of the shoreline and the existing seawall.
  • Storm Surge Mitigation: The revetment deflects wave energy, reducing the impact of storm surges and protecting the beach and surrounding properties from potential damage.

Public Access and Safety:

  • Pedestrian Access: Carefully placing sizeable cut armor stones at access points ensures that the public can safely and conveniently access the beach. This consideration is crucial for maintaining the area’s recreational valarea’s safety.
  • Enhanced Shoreline Stability: The revetment will enhance the shoreline’s stability, preventing further erosion and contributing to the long-term sustainability of the coastal area.

Construction Considerations

Environmental Impact:

  • Minimized Disruption: Efforts will be made to minimize disruption to the natural environment during construction. This includes protecting local wildlife and preserving the beach’s ecological balabeach’sstainable Practices: The project will incorporate sustainable construction practices to ensure minimal environmental impact and promote the long-term health of the coastal ecosystem.

Quality and Compliance:

  • Regulatory Adherence: The construction will adhere to local, state, and federal coastal protection and environmental preservation regulations.
  • Quality Assurance: The project will ensure high standards of quality in the placement and alignment of armor stones, guaranteeing the effectiveness and durability of the revetment.

Conclusion

The Nantasket Beach Armor Stone Revetment Project is a vital initiative for enhancing coastal protection and preserving the integrity of Nantasket Beach in Hull, Massachusetts. By implementing a carefully designed revetment with accessible beach points, the project aims to safeguard the shoreline, protect against erosion, and maintain public access to the beach. The thoughtful placement of armor stones and adherence to environmental and quality standards will contribute to the long-term resilience and usability of the coastal area.

AT A GLANCE

TITAN RoleQuality Control (QC) Manager
ClientGeorge Cairns and Sons Inc.
Contract Price$2,422,142

QCM (Quality Control Manager) Scope of Work

  • Project Oversight:
    Monitor all project activities to ensure compliance with quality standards.
  • Inspections:
    Conduct regular inspections to verify work meets specified requirements.
  • Documentation:
    Maintain accurate records of inspections, tests, and quality control measures.
  • Reporting:
    Prepare and submit quality reports to project stakeholders.
  • Problem Resolution:
    Identify quality issues and coordinate corrective actions.

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.

Cleantalk Pixel