Skip to content
HOME
BLOG
get a quote
contact us
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • DIRECT HIRE
      • RECRUITING
    • STAFFING
      • QUALITY CONTROL (QC) MANAGERS
      • SITE SAFETY AND HEALTH OFFICER (SSHO)
      • CONSTRUCTION SUPERINTENDENTS
      • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Company
    • ABOUT US
    • MEET THE TEAM
  • Expertise
    • PRE-CONSTRUCTION PLANS
    • DIRECT HIRE
      • RECRUITING
    • STAFFING
      • QUALITY CONTROL (QC) MANAGERS
      • SITE SAFETY AND HEALTH OFFICER (SSHO)
      • CONSTRUCTION SUPERINTENDENTS
      • CONSTRUCTION MANAGEMENT
    • GENERAL CONTRACTING
  • Projects
    • GOVERNMENT
    • ENVIRONMENTAL
    • HOSPITALITY
    • INDUSTRIAL
    • INFRASTRUCTURE
    • DREDGING
    • DAMS
    • OFFICE
  • Company
    • ABOUT US
    • MEET THE TEAM

LEIDOS BIOMEDICAL FACILITY PROJECT- FT DETRIK, MD

LEIDOS Biomedical Facility Project at Fort Detrick MD. Benchmark Construction QCM services ensuring quality control, compliance, and project completion.

BRIEF DESCRIPTION

The LEIDOS BIOMEDICAL FACILITY PROJECT is a federally supported biomedical research construction effort located at Fort Detrick, Maryland. Moreover, the LEIDOS BIOMEDICAL FACILITY PROJECT strengthens critical national research infrastructure for the National Cancer Institute and advanced biomedical programs. In addition, Benchmark Construction executed the construction scope while ensuring strict compliance with federal laboratory standards. Furthermore, TITAN CONSULTANTS provided QCM services, reinforcing quality assurance, system verification, and construction compliance throughout the LEIDOS BIOMEDICAL FACILITY PROJECT.


Project Scope and Laboratory Development

The PROJECT includes the construction and renovation of high-security laboratory and research environments. Additionally, the project team delivers controlled lab spaces, advanced mechanical systems, and specialized utility infrastructure. Meanwhile, construction activities focus on supporting sensitive biomedical research operations under strict federal requirements.

As a result, the PROJECT enhances laboratory functionality and research efficiency. Furthermore, QCM oversight ensures that all installations meet design specifications and federal quality standards.

Quality Control and Compliance Oversight

TITAN CONSULTANTS provided QCM services throughout the PROJECT, ensuring consistent quality monitoring and compliance enforcement. Moreover, the quality control team conducted inspections on mechanical, electrical, and structural systems. In addition, the team verified installation accuracy, material compliance, and system performance.

Consequently, the  PROJECT maintained strict adherence to federal laboratory construction standards. Furthermore, continuous QCM oversight supported safe, compliant, and high-quality project delivery.

PROJECT PROFILE

Location: Fort Detrick, Maryland, USA
Client/Agency: National Cancer Institute (NCI) / Federal Government
Facility Operator: Leidos Biomedical Research Leidos Biomedical Research
Prime Contractor: Benchmark Construction
Service Provided: QCM (Quality Control Manager)
Project Status: Project completed


Engineering and Technical Systems

The PROJECT integrates advanced engineering systems to support high-level scientific research. Additionally, the facility includes specialized HVAC systems, clean-air controls, and precision laboratory utilities. Meanwhile, electrical and mechanical systems are designed to support sensitive research equipment and operational stability.

Therefore, the PROJECT ensures long-term reliability and performance for biomedical research operations. Moreover, coordinated system integration enhances efficiency and operational safety.


Project Completion and Impact

Ultimately, the LEIDOS BIOMEDICAL FACILITY PROJECT was successfully completed, delivering a high-performance research environment at Fort Detrick. Moreover, the project strengthens national biomedical research capabilities and supports critical scientific advancement for the United States.

In addition, TITAN CONSULTANTS’ QCM services contributed directly to quality assurance, compliance validation, and successful project delivery. As a result, the LEIDOS PROJECT reinforces the reliability and integrity of federal research infrastructure.E

AT A GLANCE

Project TypeINFRASTRUCTURE
TITAN RoleQuality Control (QC) Manager
ClientBenchmark Construction
Awarded DateAugust 24, 2020

Scope of Work (Construction & Quality Control)

The LEIDOS BIOMEDICAL FACILITY PROJECT included controlled laboratory construction and technical system improvements such as:

  • Laboratory space build-out and renovation
  • HVAC and clean-air system integration
  • Mechanical and electrical system upgrades
  • Research equipment support infrastructure
  • Utility coordination for sensitive lab operations
  • Commissioning and compliance verification
  • Quality control inspections and documentation

QUICK LINKS

  • BLOG
  • TRADE PARTNERS
  • ABOUT US
  • MEET THE TEAM

CONTACT US

  • (407) 559-2005
  • [email protected]
  • 4700 Millenia Blvd., Suite #175 Orlando, FL 32839
Facebook Twitter Linkedin Pinterest Youtube

© 2013-2024, TITAN Consultants and Engineers, LLC. All Rights Reserved.